Introduction
Utility work runs on its own vocabulary. A lineman and a make ready engineer can use the same word and mean two slightly different things. When a project spans all three, that gap turns into rework, billing disputes and missed clearances.
This glossary gives a short, plain definition of the terms we use most across transmission and distribution, make ready and joint use, and field surveying. Each entry links to a deeper post or page if you want the full picture.
We've grouped the terms into three sections, and each section is alphabetical:
Line Mechanics: Sag & Tension: clearance, creep, dynamometer, initial vs. final sag, loading district, NESC, ruling span, sag, sag chart, span length, tension, wave method
Make Ready & Joint Use: attacher, attachment, communication space, double wood pole, joint use, joint use agreement, joint use audit, lowest power attachment, make ready, make ready engineering, one-touch make ready, pole loading analysis, pole owner, RYG assessment, transfer
Field Data Collection & Mapping: 360° imagery, field data collection, GIS, LiDAR, mobile mapping, point cloud, RTK GPS
Line Mechanics: Sag & Tension
Clearance
Clearance is the minimum distance required between a conductor and the ground, roads, buildings, other wires or equipment. In the U.S., the NESC sets these distances, and they vary with voltage and with what the line crosses. Sag directly controls clearance; the more a line sags, the less clearance it has at midspan.
Read more: Common Sag and Tension Mistakes · Sag and Tension Explained
Creep
Creep is the slow, permanent stretch a conductor goes through over years of sustained tension and heat. It adds sag over the life of a line, which is why designers plan around final sag rather than the sag on the day the wire was strung.
Read more: 5 Factors That Throw Off Sag and Tension in Overhead Conductors
Dynamometer
A dynamometer is an in-line load cell that measures conductor tension in real time while crews pull and string wire. It lets crews hit the target tension from the sag chart instead of estimating it, which prevents over-tensioning during construction.
Read more: Power Line Dynamometers
Initial vs. Final Sag
Initial sag is a conductor's sag when it's first strung, before it has stretched. Final sag is the sag after creep and heavy ice or wind loading have permanently stretched it. Stringing to the wrong one is a common cause of clearance violations years after construction.
Read more: Common Sag and Tension Mistakes
Loading District
Loading districts are geographic zones defined by the NESC (heavy, medium, light and warm island) that set the ice, wind and temperature loads a line must be designed to withstand. A line built to the wrong district can be under-designed for the weather it will actually see.
Read more: Common Sag and Tension Mistakes
NESC (National Electrical Safety Code)
The NESC is the U.S. standard, published by IEEE, that sets safety rules for overhead and underground utility lines. It covers clearances, structural strength and loading, and most utilities and attachers design and inspect to it.
Read more: Sag and Tension Explained · Make Ready & Joint Use
Ruling Span
A ruling span is a single "equivalent" span length used to calculate sag and tension for a section of line whose spans differ in length between dead-ends. Pulling to the wrong ruling span throws off sag in every span of that section.
Read more: Common Sag and Tension Mistakes
Sag
Sag is the vertical distance between the lowest point of a conductor and a straight line drawn between its two attachment points. It changes with temperature, load and tension, and it determines how much clearance a line has.
Read more: Sag and Tension Explained
Sag Chart (Stringing Chart)
A sag chart is a table that gives the target sag or tension for a specific conductor and span at different temperatures. Crews use it during stringing to know how tight to pull the wire for the conditions that day.
Read more: Common Sag and Tension Mistakes
Span Length
Span length is the horizontal distance between two consecutive poles or structures. At the same tension, a longer span sags more than a shorter one.
Read more: Sag and Tension Explained
Tension
Tension is the pulling force along a conductor, usually measured in pounds. Tension and sag move in opposite directions: more tension means less sag, but too much tension overloads poles, guys and hardware.
Read more: Sag and Tension Explained · WaveTimer blog
Wave Method (Return-Wave or "Jerk Test")
The wave method checks sag and tension on an existing line. A lineman jerks the conductor, and the time the wave takes to travel to the next structure and back is used to calculate sag and tension. Tools like WaveTimer time the wave automatically and read conductor temperature at the same moment.
Read more: WaveTimer · WaveTimer blog
Make Ready & Joint Use
Attacher
An attacher is a company, usually a telecom, cable or broadband provider, that places cables or equipment on a pole it doesn't own. Attachers typically pay the pole owner an annual fee for each pole they're on.
Read more: Bessemer Joint Use Audit Case Study
Attachment
An attachment is any cable, wire or piece of equipment fastened to a utility pole, such as a fiber line, streetlight, transformer or service drop. Each third-party attachment is normally covered by an agreement and billed to its owner.
Read more: Make Ready & Joint Use
Communication Space
The communication space is the section of a pole, below the power lines, reserved for telephone, cable and fiber attachments. It's separated from the power space by a safety buffer called the communication worker safety zone.
Read more: Make Ready & Joint Use
Double Wood Pole
A double wood pole is a location where a new pole has been set beside an old one, but the old pole was never removed because its attachments haven't been transferred. Double wood poles create safety, liability and appearance problems for pole owners.
Read more: Bessemer Joint Use Audit Case Study
Joint Use
Joint use is the shared use of utility poles by more than one company, typically an electric utility and one or more communications providers. The terms are set in a joint use or pole attachment agreement.
Read more: Make Ready & Joint Use
Joint Use Agreement (Pole Attachment Agreement)
A joint use agreement is the contract between a pole owner and an attacher. It sets attachment fees, space allocation and safety standards, and it spells out who pays for make ready and pole replacements.
Read more: Make Ready & Joint Use
Joint Use Audit
A joint use audit is an independent count of every pole and every attachment in a system. It verifies who is attached where and often checks whether attachments meet NESC clearances. Audits correct billing records and frequently uncover attachments the pole owner was never billing for.
Read more: Bessemer Joint Use Audit Case Study
Lowest Power Attachment
The lowest power attachment is the lowest electric-supply component on a pole, such as a neutral, secondary or piece of equipment. Its height sets the top limit of the communication space, so it's one of the most important measurements in make ready.
Read more: Make Ready & Joint Use
Make Ready
Make ready is the work needed to prepare an existing pole for a new attachment. That can mean moving or raising current attachments, or replacing the pole with a taller or stronger one. Make ready has to be finished before a new attacher can hang its cable.
Read more: Make Ready & Joint Use · Make Ready Engineering Timeline
Make Ready Engineering
Make ready engineering is the survey and design step that determines exactly what work each pole needs. It combines field data (attachment heights, span lengths, existing attachers) with clearance rules and pole loading analysis.
Read more: Make Ready Engineering Timeline · Field Data Collection
One-Touch Make Ready (OTMR)
One-touch make ready is an FCC policy that lets a single approved contractor perform simple make ready on all existing communications attachments at once, rather than each attacher sending its own crew. It's meant to speed up broadband deployment.
Read more: Make Ready & Joint Use
Pole Loading Analysis
Pole loading analysis is an engineering calculation of whether a pole can safely carry all of its attachments plus wind and ice loads. It decides whether a pole can take a new attachment as-is or has to be replaced.
Read more: Make Ready & Joint Use
Pole Owner
The pole owner is the utility, co-op, municipality or telecom company that owns a pole and leases space on it to attachers.
Read more: Bessemer Joint Use Audit Case Study
Red Yellow Green Assessment (RYG)
An RYG assessment sorts poles by how much make ready they need: green poles are ready to attach, yellow poles need simple make ready, and red poles need complex work or replacement. It gives a quick picture of a project's cost and timeline before full engineering begins.
Read more: Make Ready & Joint Use · Make Reay Assessment
Transfer
A transfer is the work of moving attachments from an old pole to its replacement so the old pole can be removed. Slow or missed transfers are what leave double wood poles behind.
Read more: Bessemer Joint Use Audit Case Study
Field Data Collection & Mapping
360° Imagery
360° imagery is spherical, street-level photography captured by a vehicle-mounted or handheld camera that shows everything around the capture point. Paired with RTK GPS and measurement software like Azmyth, it can be used to measure poles and attachments without sending a crew back to the site.
Read more: 360° Imagery vs. LiDAR · Field Data Collection
Field Data Collection
Field data collection is the process of gathering information about poles and lines (locations, heights, attachments, equipment and photos) to support make ready, joint use audits and asset inventories. Methods range from crews with measuring sticks to vehicle-mounted cameras and LiDAR.
Read more: Field Data Collection · How to Collect Field Data on Power Poles
Geographic Information System (GIS)
A GIS is software that stores, maps and analyzes location-based data. For utilities, it ties every pole and asset to its coordinates so the system can be searched, counted and mapped instead of living in a static drawing.
Read more: Bessemer Joint Use Audit Case Study
LiDAR
LiDAR is a surveying method that fires laser pulses and times their return to build a highly detailed 3D model of the surroundings, called a point cloud. It's very accurate, data intensive and often expensive.
Mobile Mapping
Mobile mapping is the collection of survey data (imagery, LiDAR or both) from a moving vehicle. It lets crews cover many miles of road per day instead of walking from pole to pole. Our 360° collection covers about 100 miles a day.
Read more: Field Data Collection
Point Cloud
A point cloud is the dataset LiDAR produces: millions of individual 3D points that together form a measurable digital model of an area. Point clouds have to be processed in software such as AutoCAD or ArcGIS before measurements can be taken from them.
Read more: 360° Imagery vs. LiDAR
RTK (Real-Time Kinematic) GPS
RTK is a GPS correction technique that uses a fixed base station or correction network to improve location accuracy from several meters to about 1–3 centimeters. RTK is what makes survey-grade measurements possible from mobile imagery.
Read more: 360° Imagery vs. LiDAR · Field Data Collection